The EPI Auxiliary Bridge is the logical and practical solution to expedite your refueling process.

Designed for personnel to manipulate Underwater Lighting and RF Shoehorns, our bridge will eliminate crucial downtime when used in tandem with the manipulator crane.  Additionally, EPI's Auxiliary Bridge has routinely been used for supporting a variety of RX cavity projects, such as FME retrieval (FOSAR), cavity decontamination, and vessel inspections.

3-Pc Aluminum w/ SuperStructure & Man Baskets -- Standard 2-Pc Aluminum -- 2-Pc Aluminum w/ RisersBuilt to accomodate the industry's dynamic work environment, EPI's Auxiliary Bridge is engineered to your specific criteria (height, rail-to-rail length, number of sections, etc.), load limit, and seismic response spectra (if applicable).

Some of the key design features of Master-Lee's bridge:

  • Aluminum, 2-Piece construction
  • 4" high toe kick-plates
  • Slip-Resistant decking
  • OSHA Handrails (removable)
  • 36" wide walkway (standard)
  • Requires less than 15 lbs. of force to move
  • NO CRABBING or BINDING
  • Assembly time at less than 2 hours
  • Stress analysis and load testing performed

Single-Piece SteelOptional features:

  • Seismic analysis
  • 3-Piece construction
  • Super-Structure
  • Storage containers
  • Carbon steel construction
  • Swingates {ppgallery} outage_support_equipment/auxiliary_bridge {ppgallery}

 

 

 

Let us design a bridge for your next outage.  Please call and discuss the design options with our engineers.

SF Pool Work Platform